Download the 70% Submission Plan Set at the links below:
Combined Plan Set (PDF)
Combined Cross Sections (PDF)
Estimated Project Cost
Total Cost: $45,500,000 Preliminary Engineering: $4,076,000 Right of Way and Utilities: $8,591,000 Construction: $32,833,000