70% Submission Plan Set

Download the 70% Submission Plan Set at the links below:

Combined Plan Set (PDF)
Combined Cross Sections (PDF)

Revised Leigh Street Roundabout:

Plan Sheet 18_Revised Leigh St Roundabout (PDF)
Plan Sheet 19_Revised Leigh St Roundabout (PDF)

 

Estimated Project Cost

Preliminary Engineering:$4,242,640
Right of Way and Utilities:$10,000,000
Construction:$37,500,360

Total Cost:$51,743,000

Upcoming Events

Design Public Hearing
November 18, 2025 | 5-7 p.m.
Main Street Station (1st Floor)
1500 E Main Street
Richmond, VA 23219

Want to receive updates on public workshops and other project information? Subscribe today.

Project Manager

Adel Edward, P.E.


Phone:   (804) 646-6584
Email:    info@shockoevalleystreets.com

Phone: (804) 646-6584
Email: info@shockoevalleystreets.com