70% Submission Plan Set Download the 70% Submission Plan Set at the links below: Combined Plan Set (PDF) Combined Cross Sections (PDF) Estimated Project Cost Preliminary Engineering: $4,242,640 Right of Way and Utilities: $10,000,000 Construction: $37,500,360 Total Cost: $51,743,000